Commercial HVAC Installation and Replacement

Rooftop package units, split systems, VRF/VRV and ductwork for new construction, tenant improvements and equipment retrofits across San Diego County, Title 24-compliant and commissioned.
  • CSLB

    License #669421

  • Since

    1993

  • Insured

    Bonded & insured

  • Serving

    San Diego County

  • Rated

    5.0 ★ on Google

What we install

From a single rooftop unit to the full mechanical scope

Commercial installation is scope work: the equipment is only part of it. A rooftop unit needs a curb that fits, a crane that can reach, electrical sized for the new nameplate, duct that delivers the design airflow, controls that talk to the building, and paperwork that satisfies the inspector and the energy code. We carry the whole scope, and we coordinate it with the general contractor’s schedule rather than around it.

Typical projects are rooftop package-unit replacements on retail and office buildings, split systems and heat pumps for suites, VRF/VRV systems for offices and medical spaces, ductwork rework for tenant improvements, and the mechanical scope on new small and mid-size commercial buildings and multi-unit residential.

Scope we take on

  • Rooftop package units (gas/electric and heat pump), including crane lift and curb adapters
  • Split systems and heat pumps for suites, offices and small buildings
  • VRF / VRV multi-zone systems for offices, medical suites and hospitality
  • Ductwork design, fabrication coordination and installation
  • New-construction HVAC scope from rough-in through startup
  • Tenant improvements: rework existing systems for new layouts and loads
  • Equipment replacement and retrofit in occupied buildings
  • Electrical connections under our own C-10 classification
  • Building-automation and controls integration
  • Title 24 compliance forms, acceptance testing coordination and permitting
  • Startup, commissioning and documented closeout

Need service on equipment that’s already installed? See commercial service and maintenance.

Process

How a commercial installation runs

The same sequence whether it's one unit or a full building: the difference is how many people we coordinate with.

  1. 01

    Scope & submittals

    Plans or site walk

    We review plans or walk the space, confirm loads and equipment selections, and issue submittals and cut sheets for approval.

  2. 02

    Design coordination

    Before fabrication

    Duct routing, curb and structural coordination, electrical requirements and controls scope are settled with the GC, engineer and other trades before anything is fabricated.

  3. 03

    Installation

    Sequenced with trades

    Rough-in, equipment set (crane day planned in advance), duct, piping, electrical and controls, sequenced with your schedule.

  4. 04

    Startup & commissioning

    Documented

    Refrigerant charge verified, airflow balanced, controls sequenced and tested, and a startup report produced for the closeout package.

  5. 05

    Closeout

    Documented

    When the project needs one, the mechanical inspection is scheduled and attended; Title 24 acceptance documentation is completed and O&M information handed over.

What affects price

What drives a commercial installation quote

We quote from plans or a site walk, itemized by scope. No two projects price the same, but these are the variables that matter most.

Send us the scope
Equipment type and tonnage
A rooftop package unit, a split system and a VRF system at the same capacity are very different costs; capacity and efficiency tier move the number further.
New install vs. replacement
Replacement reuses curbs, duct and electrical where they're sound; new construction and TIs add duct fabrication, structural and electrical scope.
Roof access and crane
Crane size, street closure or permit requirements, and whether a curb adapter is needed all affect the equipment-set day.
Ductwork and controls
New or reworked duct, dampers, zoning and building-automation integration are priced as their own scope.
Title 24 and permitting
Acceptance tests, third-party verification where required, and jurisdiction permit fees vary by project and city.
Schedule and occupancy
Work in an occupied building (after-hours, phased or with temporary cooling) costs more than an open shell.

FAQ

Commercial installation questions

Can you replace a rooftop unit without shutting the business down?

Usually. Most single-unit replacements are completed in a day: the crane lift is scheduled early, the old unit comes off, the new one goes on the existing curb or a curb adapter, and it's running by the afternoon. For multiple units we phase the work so part of the building always has cooling.

Do you handle Title 24 requirements on commercial installations?

Yes. We complete the Title 24 compliance forms for the mechanical scope and coordinate any required acceptance testing. When the project needs a permit, we make sure it and the inspection reflect the energy-code requirements for the project.

Do you do the electrical work for the HVAC equipment?

Yes. Superior Air holds a C-10 Electrical classification alongside its C-20 HVAC license, so disconnects, circuits and equipment connections for the mechanical scope can be done by our own crew rather than coordinated with a separate electrical sub.

Verify the license with the CSLB
How far ahead should a GC bring you into a project?

Ideally at plan review or bid, before duct routing and structural details are locked. On a tenant improvement, a site walk before demolition avoids most surprises. We can still take on a project mid-stream; there is simply less room to solve problems cheaply.

Commercial quote

Have plans or a scope? Send them over.

We'll review the mechanical scope, confirm what we can commit to on your schedule, and respond with a written proposal.