Skip to content

$1,500 OffNew Installsa Free Smart Thermostat

Claim This Offer
Superior Air · Air Conditioning & Heating Systems
Commercial · Rooftop units

Commercial Rooftop Unit Replacement in San Diego

Superior Air replaces commercial rooftop package units for general contractors, property managers and business owners across San Diego County: crane lift, curb adaptation, gas and electrical reconnection, and startup, typically completed in one to three days. Licensed C-20 and C-10 since 1993.

  • CSLB

    License #669421

  • Since

    1993

  • Insured

    Bonded & insured

  • Serving

    San Diego County

  • Rated

    5.0 ★ on Google

Overview

What a rooftop unit replacement involves

A commercial rooftop unit (RTU) is a self-contained package system, compressor, coil, fan and often a gas furnace section, all in one cabinet, sitting on a roof curb and ducted directly into the building below. Replacing one is a different job from a residential split-system changeout: everything has to come off and go on by crane, the new unit has to interface with the existing curb and ductwork, and the building underneath is usually still occupied and operating.

Superior Air has replaced rooftop units on retail buildings, offices, restaurants and light-industrial space across the county for general contractors and property managers, coordinating crane logistics, curb work and building-automation integration as part of the scope, not as change orders discovered mid-project.

Scope

What's included in a Superior Air RTU replacement

  • Existing-condition survey: curb size and condition, roof structure, gas and electrical service, ductwork connections
  • Crane lift planning: street closure or parking-lot staging, rigging, and timing around building operations
  • Curb adaptation: matching a new unit's footprint to an existing curb, or a curb adapter where the new unit's dimensions differ
  • Electrical and gas reconnection under our own C-20 and C-10 licenses
  • Economizer, controls and building-automation integration where the building has it
  • Startup, commissioning and Title 24 acceptance testing coordination
  • Old unit removal, refrigerant recovery and disposal

Crane and curb

The two things that decide how the job actually goes

Crane logistics and curb condition drive schedule and cost more than the equipment itself.

What we evaluate during the site survey, before writing the scope.
FactorConsiderationWhy it matters
Curb condition and footprintWhether the existing curb can be reused as-is, needs an adapter, or needs to be rebuilt for the new unit's dimensions and duct connections
Crane stagingStreet closure, parking-lot access or an adjacent lot, and whether overhead lines, other buildings or tenant hours limit the lift window
Gas and electrical capacityWhether existing service supports the new unit or needs upgrading, especially when switching between gas/electric and heat pump configurations
Occupied-building constraintsTenant hours, sensitive occupancies (medical, food service, server rooms) and whether temporary cooling is needed during the swap
Controls and building automationWhether the new unit needs to integrate with existing building-automation or is a standalone replacement

Process

How an RTU replacement goes, start to finish

  1. 01

    Site survey

    On site

    We inspect the existing unit, curb, roof access, gas and electrical service, and confirm crane staging options before quoting.

  2. 02

    Written scope

    Before ordering equipment

    Equipment selection, curb strategy (reuse, adapt or replace), crane and scheduling plan, and any ductwork or controls work, in writing.

  3. 03

    Equipment ordering and scheduling

    Lead time varies by equipment

    Commercial package units are typically special-order. We coordinate delivery with the crane date and building access.

  4. 04

    Crane day

    The core of the 1–3 day window

    Old unit disconnected, refrigerant recovered, unit lifted off, curb prepped or adapted, new unit set and connected.

  5. 05

    Startup and commissioning

    Documented

    Refrigerant charge, airflow, economizer and controls verified; Title 24 acceptance testing coordinated where the project requires it.

FAQ

Rooftop unit replacement questions

How long does a commercial rooftop unit replacement take?

Most single-unit replacements take one to three days, depending on curb condition, whether a curb adapter is needed, ductwork or controls work, and crane scheduling. Multi-unit projects or occupied-building phasing can extend that.

Do you always need a crane?

For a true rooftop package unit, yes, almost always. The unit has to come off and the replacement has to go on, and neither is practical without a crane lift on the vast majority of commercial buildings. We plan crane staging (street, parking lot or adjacent lot) as part of the written scope.

Can the new unit go on the existing curb?

Sometimes. If the new unit's footprint and duct connections match the existing curb closely enough, we reuse it. More often, especially when upgrading efficiency tier or switching between gas/electric and heat pump configurations, a curb adapter bridges the difference between the old and new unit's dimensions.

Can you replace an RTU without shutting down the business below it?

In many cases, yes, particularly with advance scheduling, after-hours crane work where the site allows it, and temporary cooling planned for sensitive occupancies. We discuss occupied-building constraints during the site survey, not after the crane is booked.

Gas/electric or heat pump: which package unit is right for our building?

It depends on existing gas service, the building's electrical capacity, and whether the ownership is targeting an all-electric retrofit. We review the existing infrastructure during the survey and present the options that actually fit the building, not a single default.

Get an estimate

Have a rooftop unit that needs replacing?

Tell us about the building, the unit and any access constraints. We'll survey the roof, confirm curb and crane logistics, and put the scope in writing.

Call NowGet an Estimate